Bid information is listed below. All Bidders are responsible for checking the site up until Bid Due deadline to ensure that they have all documents, including all addenda.
Contractors and suppliers interested in a particular project are encouraged to email engineer@peed-bortz.com to be registered on the project’s Plan-Holder List. Please indicate the project and provide company, contact name, email, telephone number, and participation type (General Contractor Bidder, Subcontractor, or Supplier).
Project: | Town of Hurt, Virginia DBP Remediation & Water Improvements-Phase II |
Summary | Work consists of three Divisions to be awarded as separate contracts. Division I generally consists of 1000 lf of 12” water main with a road bore, rail bore and PRV vault. Division II consists of 660 lf of 12” water main, meter vault modifications, and modifications to an existing water pump station. Division III includes the installation of a mixing and aeration system at the existing Town of Hurt elevated water storage tank. |
Pre-Bid Meeting | A Non-Mandatory Pre-Bid Conference shall be held at 10:00 AM local prevailing time May 16th, 2025 at the Contact engineer@peed-bortz.com to be added to the plan holder list. |
Bid Opening | June 27th, 2025 2:00 P.M. (revised per Addendum 1) |
Location | Town Office of Hurt, 533 Pocket Road, Hurt, VA 24563 |
Documents | |
Contract Documents | |
Technical Specifications | |
Addendum 1-May 23, 2025 | |