Bid information is listed below. All Bidders are responsible for checking the site up until Bid Due deadline to ensure that they have all documents, including all addenda.
Contractors and suppliers interested in a particular project are encouraged to email engineer@peed-bortz.com to be registered on the project’s Plan-Holder List. Please indicate the project and provide company, contact name, email, telephone number, and participation type (General Contractor Bidder, Subcontractor, or Supplier).
Project: | New River Regional Water Authority – Water Treatment Plant Expansion |
Summary | Expansion of the existing 4.0 MGD water treatment plant to 6.33 MGD capacity including improvements to the raw water intake, chemical feed and mixing systems, sedimentation and sludge collection systems, gravity filters, finished water pumping system, solids handling basins, and electrical and control systems; and construction of new solids handling and sludge dewatering facilities. |
Pre-Bid Meeting
| Thursday, April 18, 2024 @ 1:00 PM (Pre-Bid Meeting attendance is encouraged, but not required) |
Bid Opening | Thursday, May 9, 2024 @ 2:00 P.M. 289 Kohler Ave. Austinville, VA 24312 |
Advertisement | NRRWA WTP Expansion – 00130 Advertisement For Bids.pdf |
Contract Documents
| Upfront Bid Documents & Technical Specifications Additional Electrical Technical Specification Sections (Contains Sections included in Contract Documents Table of Contents which were omitted from posted “22-18 NRRWA WTP Expansion Contract Documents 03_12_2024.pdf” file.) Section 00410 – Bid Form (Identical to Bid Form contained in Upfront Bid Documents & Technical Specifications file. Provided as a standalone document for printing convenience). |
Addendum #1 (5/3/2024) | Addendum #1 (Main Text Document & Wage Rate Determinations) Sheet D03 – “Standard Details” Revised Electrical Plan Sheets {Upload Pending} |
Additional Reference Documents (Updated 04/15/2024) | Geotechnical Engineering Report Original Treatment Plant Record Drawings (2009 Construction Completion) Original Treatment Plant Control Panel Drawings & Bill of Materials (2009 Construction Completion) Previous Filter #1 Improvements (Filter #1 PWI Insert & Media Replacement – Performed in 2021) |
Plan Holders | Registered Plan Holders List (05/01/2024) |
Pre-Bid Meeting (04/18/2024) |